Columbus PreK-8 School
Sector: Metal • Location: Whiteville, North Carolina, United States of America
Source: Dodge
The Columbus County Schools East View PK-8 project includes the construction of a new 117,799 square foot educational campus serving grades Pre-K through 8. The campus will consist of a two-story main building housing classroom, administrative offices, a media center, gymnasium, and cafeteria, as well as two pre-engineered metal buildings PEMBs supporting auxiliary educational and athletic functio
- Status
- Prospective
- Sector
- Metal, Steel, Education, Cement, Government, Residential, Commercial
- Location
- Whiteville, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Columbus PreK-8 School
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, pre-qualification |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Columbus County Schools East View PK-8 project includes the construction of a new 117,799 square foot educational campus serving grades Pre-K through 8. The campus will consist of a two-story main building housing classroom, administrative offices, a media center, gymnasium, and cafeteria, as well as two pre-engineered metal buildings PEMBs supporting auxiliary educational and athletic functions. Key features of the main building include a concrete slab-on-grade foundation, structural ste... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Whiteville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Education, Cement, Government, Residential, Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
