Comal County Stallion Estates Pump Station
Sector: Waste Processing and Treatment • Location: Spring Branch, Texas, United States of America
Source: Dodge
This Project includes the construction of a new pump station building, including discharge room, electrical room, and canopy. Pump station consists of two 600 gpm vertical turbine pumps, pump cans, and piping as well as an additional pump can for a future 600 gpm pump. B. The Project also includes two flow meter assemblies, including electromagnetic flow meters, solenoid control valves, foundation
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Wind, Manufacturing (Industrial)
- Location
- Spring Branch, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Comal County Stallion Estates Pump Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project includes the construction of a new pump station building, including discharge room, electrical room, and canopy. Pump station consists of two 600 gpm vertical turbine pumps, pump cans, and piping as well as an additional pump can for a future 600 gpm pump. B. The Project also includes two flow meter assemblies, including electromagnetic flow meters, solenoid control valves, foundations, piping electrical and instrumentation, yard piping, site fencing, paving, grading and other ap... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Spring Branch |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Wind, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
