Comasel Louga
Sector: Residential • Location: Senegal
Source: International Finance Corporation (IFC)
The proposed Greenfield Project is a rural electrification of the region of Louga in Senegal and approximately 210 km north of the capital Dakar. The Project is part of the local electrification plan (Plan Local d’Electrification) of the Government of Senegal which aims to reach 62% access rate in 2022 as compared to 8% access rate in 2008. The Company has been granted a concession for 25 years
- Status
- Closed
- Sector
- Residential, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Solar, Government, Commercial
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Comasel Louga
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Greenfield Project is a rural electrification of the region of Louga in Senegal and approximately 210 km north of the capital Dakar. The Project is part of the local electrification plan (Plan Local d’Electrification) of the Government of Senegal which aims to reach 62% access rate in 2022 as compared to 8% access rate in 2008. The Company has been granted a concession for 25 years by the Senegalese Agency in charge of rural electrification (ASER), and is required to undertake the major part of the investments within the first 3 years. Comasel St. Louis, an IFC investment, will be managing the Project for 16 months prior to creating a separate company- Comasel Louga to manage it. Comasel St. Louis is a wholly owned subsidiary of ONE, the Moroccan electricity utility Company with proven track records in rural electrification program in Morocco. The Project consists of the design, construction, operation and maintenance of a rural electricity distribution system to connect and supply electricity to 11,826 new households throughout 372 villages in Kebemer, Linguere and Louga by either extension of existing grid network, or installation of individual solar kits. The existing medium voltage lines from SENELEC are 30 KV. In the first three years the Project will bring light to 372 villages through 900km of extension of grid network, 242 poles, and 1,852 solar kits. The concession area- the region of Louga represents 15% of the Senegalese territory and covers an area of 29,188 km² with a population of approximately 622,000 inhabitants of which 80% is rural; only 13% of this rural population was electrified as of 2006. 84% of the potential new customers of the Company will be connected through the extension of the grid and the remaining through solar kits. |
Original sector | EB - Rural Electrification |
Procurement method |
Location
Country | Senegal |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Residential, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Solar, Government, Commercial |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in Senegal
- Notto Diosmone Palmarin and Gorom Lampsar Water Supply System
- DEVELOPPEMENT DE SERVICES FINANCIERS DIGITAUX
- Location d'espaces de travail, de café, de formation et d'évènementiel
- Senegal - Cities Modernisation Programme – Phase 1 (Promovilles-1)
- Senegal - Senegal Virtual University Support Project
- Senegal Cross Currency Swap
- BRT Dakar
- Kounoune Power, SA
