Combat Logistics Batallion-4 Facility
Sector: Advanced Electronics • Location: GUAM, United States of America
Source: United States of America (U.S.A. or USA)
Constructs a permanent low-rise facility with reinforced concrete structural frame, walls, floor and roof with fluid-applied roofing, and concrete shallow foundation system. Primary facilities consist of a maintenance building, an administrative building, and other miscellaneous facilities. Facilities support USMC Combat Logistics Batallion-4 (CLB-4), Headquarters & Service Company (H&S Co.), Tran
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Constructs a permanent low-rise facility with reinforced concrete structural frame, walls, floor and roof with fluid-applied roofing, and concrete shallow foundation system. Primary facilities consist of a maintenance building, an administrative building, and other miscellaneous facilities. Facilities support USMC Combat Logistics Batallion-4 (CLB-4), Headquarters & Service Company (H&S Co.), Transportation Services Company (TSC), Engineers Services Company (ESC), Combat Logistics Regiment 3 (CLR-3) and 3rd Marine Logistics Group (3MLG). The maintenance building includes an automotive organizational shop, electronics / communications shop, construction / weight handling equipment shop, and air or ground or organic units storage. The maintenance building will include service bays, direct support spaces, administrative support spaces, storage, and miscellaneous support spaces. The administration building supports USMC battalion / squadron headquarters and company / battery headquarters. The administration building includes private and open offices, conference rooms, secure workstations, secure meeting rooms, and miscellaneous support spaces. The other facilities consist of a vehicle wash rack facility with vehicle wash rack platforms, vehicle holding shed, and operational hazardous/flammable storage building. Facility-related control systems include cybersecurity features in accordance with current Department of Defense criteria. This project will provide Antiterrorism (AT) features and comply with applicable service and Geographic Combatant Commander policies and directive per UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings. Built-in equipment includes one monorail crane (2-ton), and two bridge cranes (one 10-ton and one 5-ton). Special costs include Post Construction Contract Award Services (PCAS), Guam gross receipts tax, and cybersecurity commissioning. The cybersecurity commissioning cost is to cover the Navy's (DON) cybersecurity requirements as well as DONs in-house costs to review contractor submittals and to implement steps necessary for obtaining Authority to Operate. Also included is geospatial surveys and mapping. Operations and Maintenance Support Information (OMSI) is included in this project. Department of Defense and Department of the Navy principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate. Site preparation includes clearing, grubbing, and earthwork. Paving and site improvements include operational vehicle laydown area, parking facilities with approximately 170 stalls, access road, sidewalks, security lighting, trash enclosure, bicycle racks, 1,100 linear meters by 2.4 meter high chain link fencing and gates, landscaping, rip-rap retaining walls, and an infiltration/detention basin. Electrical utilities include primary and secondary electrical distribution systems, transformer enclosure, lightning protection system, area lighting, and telecommunication distribution systems. Mechanical utilities include potable water distribution system, fire water distribution system, chilled water distribution, system sanitary sewer system, mechanical utility building with mechanical yard, and storm drainage system. Environmental mitigation including contractor Cultural Resources (CR) mitigation including training and planning activities, government CR mitigation including monitoring activities and conducting contractor training, contractor Natural Resources (NR) mitigation including training and planning activities, and government NR mitigation includes pre-construction surveys, contractor training and monitoring activities. Munitions & Explosives of Concern (MEC) mitigation including MEC planning and clearance activities. Facilities will be designed to meet or exceed the useful service life specified in DoD Unified Facility Criteria. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency. There are limited facilities at Finegayan to support CLB-4 requirements. The development of MCB Guam in the northern section of Finegayan is in the initial stages, requiring significant site improvements, grading, and utility infrastructure, to provide for the necessary facilities to support approximately 5,000 personnel. The 2009 Guam International Agreement was amended in October 2013 between the United States Government and the Government of Japan. The agreement outlines the realignment of Marine Corps elements to reduce United States military footprint in Okinawa, including the relocation of forces from Japan to Guam. The Guam Master Plan was completed in June 2014 to ensure all operational, base support, training, quality of life requirements, support facilities, and infrastructure were efficiently identified. The majority of the MCB Guam northern area is undeveloped and requires significant site improvements, grading, earthwork, utility infrastructure, fencing and roadways to support vertical construction. CLB-4 requires operational, maintenance, and support facilities to conduct the mission requirements of Marine Air Ground Combat Task Force operating out of NSA MCB Guam. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Advanced Electronics projects in United States of America
- West Bay Yards
- Mushrooms for the Campus Center for Approriate Technology
- East 14th Street
- Southern University Reaching Across the Digital Divide (SURADD): Connecting Minority Communities Pilot
- Meeting the Needs of Underrepresented Communities by Providing Broadband Access and Training
- Missouri Network Alliance dba Bluebird Network MO to OK NTIA MMGP
- Creating Connections: Building Equitable Access to Broadband in Newark through Public-Private Collaborations
- Connecting Broward UP Communities (CBC) Project
