logo

Combat Logistics Batallion-4 Facility

Sector: Advanced Electronics • Location: GUAM, United States of America

Source: United States of America (U.S.A. or USA)

Project
Closed

Constructs a permanent low-rise facility with reinforced concrete structural frame, walls, floor and roof with fluid-applied roofing, and concrete shallow foundation system. Primary facilities consist of a maintenance building, an administrative building, and other miscellaneous facilities. Facilities support USMC Combat Logistics Batallion-4 (CLB-4), Headquarters & Service Company (H&S Co.), Tran

Project Information FAQ

Project Information

4 Q
The project “Combat Logistics Batallion-4 Facility” is an infrastructure initiative in the Advanced Electronics sector, located in GUAM, Guam, United States of America. Taiyo aggregates data on it from United States of America (U.S.A. or USA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Constructs a permanent low-rise facility with reinforced concrete structural frame, walls, floor and roof with fluid-applied roofing, and concrete shallow foundation system. Primary facilities consist of a maintenance building, an administrative building, and other miscellaneous facilities. Facilities support USMC Combat Logistics Batallion-4 (CLB-4), Headquarters & Service Company (H&S Co.), Transportation Services Company (TSC), Engineers Services Company (ESC), Combat Logistics Regiment 3 (CLR-3) and 3rd Marine Logistics Group (3MLG). The maintenance building includes an automotive organizational shop, electronics / communications shop, construction / weight handling equipment shop, and air or ground or organic units storage. The maintenance building will include service bays, direct support spaces, administrative support spaces, storage, and miscellaneous support spaces. The administration building supports USMC battalion / squadron headquarters and company / battery headquarters. The administration building includes private and open offices, conference rooms, secure workstations, secure meeting rooms, and miscellaneous support spaces. The other facilities consist of a vehicle wash rack facility with vehicle wash rack platforms, vehicle holding shed, and operational hazardous/flammable storage building. Facility-related control systems include cybersecurity features in accordance with current Department of Defense criteria. This project will provide Antiterrorism (AT) features and comply with applicable service and Geographic Combatant Commander policies and directive per UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings. Built-in equipment includes one monorail crane (2-ton), and two bridge cranes (one 10-ton and one 5-ton). Special costs include Post Construction Contract Award Services (PCAS), Guam gross receipts tax, and cybersecurity commissioning. The cybersecurity commissioning cost is to cover the Navy's (DON) cybersecurity requirements as well as DONs in-house costs to review contractor submittals and to implement steps necessary for obtaining Authority to Operate. Also included is geospatial surveys and mapping. Operations and Maintenance Support Information (OMSI) is included in this project. Department of Defense and Department of the Navy principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate. Site preparation includes clearing, grubbing, and earthwork. Paving and site improvements include operational vehicle laydown area, parking facilities with approximately 170 stalls, access road, sidewalks, security lighting, trash enclosure, bicycle racks, 1,100 linear meters by 2.4 meter high chain link fencing and gates, landscaping, rip-rap retaining walls, and an infiltration/detention basin. Electrical utilities include primary and secondary electrical distribution systems, transformer enclosure, lightning protection system, area lighting, and telecommunication distribution systems. Mechanical utilities include potable water distribution system, fire water distribution system, chilled water distribution, system sanitary sewer system, mechanical utility building with mechanical yard, and storm drainage system. Environmental mitigation including contractor Cultural Resources (CR) mitigation including training and planning activities, government CR mitigation including monitoring activities and conducting contractor training, contractor Natural Resources (NR) mitigation including training and planning activities, and government NR mitigation includes pre-construction surveys, contractor training and monitoring activities. Munitions & Explosives of Concern (MEC) mitigation including MEC planning and clearance activities. Facilities will be designed to meet or exceed the useful service life specified in DoD Unified Facility Criteria. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency. There are limited facilities at Finegayan to support CLB-4 requirements. The development of MCB Guam in the northern section of Finegayan is in the initial stages, requiring significant site improvements, grading, and utility infrastructure, to provide for the necessary facilities to support approximately 5,000 personnel. The 2009 Guam International Agreement was amended in October 2013 between the United States Government and the Government of Japan. The agreement outlines the realignment of Marine Corps elements to reduce United States military footprint in Okinawa, including the relocation of forces from Japan to Guam. The Guam Master Plan was completed in June 2014 to ensure all operational, base support, training, quality of life requirements, support facilities, and infrastructure were efficiently identified. The majority of the MCB Guam northern area is undeveloped and requires significant site improvements, grading, earthwork, utility infrastructure, fencing and roadways to support vertical construction. CLB-4 requires operational, maintenance, and support facilities to conduct the mission requirements of Marine Air Ground Combat Task Force operating out of NSA MCB Guam.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data