logo
ProjectProject In Construction

Combined road-rail bridge project in Latvia

The status, timeline and source of this project. A free account opens every field.

Source: InfraPPPWorld

The project involves the construction of a 1.1 km long two-level road-rail bridge over the Daugava River in Latvia.The bridge comprises eight 150-m-long spans with the railway line positioned at the lower level, around 12 m above the water, while the highway is situated on top, approximately 22 m above the river. For safety reasons, pedestrian and cyclist access will be prohibited on the high-spee

Status
Under Construction
Sector
Bridge, Road, Rail, Water Supply and Storage, Mass Transit, Cement, Steel, Metal, Government, Automotive
Location
Riga, Latvia
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Combined road-rail bridge project in Latvia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Combined road-rail bridge project in Latvia” is an infrastructure initiative in the Bridge sector, located in Riga, Latvia. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

project in construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of a 1.1 km long two-level road-rail bridge over the Daugava River in Latvia.The bridge comprises eight 150-m-long spans with the railway line positioned at the lower level, around 12 m above the water, while the highway is situated on top, approximately 22 m above the river. For safety reasons, pedestrian and cyclist access will be prohibited on the high-speed section of the Riga Ring Road (A4) that crosses the Daugava River. As trains are expected to reach speeds of up to 300 km/h, separate infrastructure, such as parallel roads or an additional bridge, will be constructed to accommodate pedestrians and cyclists. The construction of the bridge includes a steel truss grid and a monolithic reinforced concrete road and railway deck, with 2+2 lanes for car traffic and 1+1 rails for high-speed railway. The bridge is designed to comply with the Eurocode standards for railway and road loads.The project aims to establish a safe and efficient national highway network, enabling Riga to bypass accessibility from any administrative center within 2 hours or less.

Original sector

Transport

Location

Country

Latvia

State

Riga

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Bridge, Road, Rail, Water Supply and Storage, Mass Transit, Cement, Steel, Metal, Government, Automotive

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project