Comite Brooks Lake Control Structure and Guide Levee
One of 10,000+ projects Taiyo tracks in Louisiana.
Source: Dodge
The w ork consists of constructing a guide levee, access ramp, a closure structure, w hich includes a 54 pipe, headw all, and flap gate, turf establishment, and improving an existing access road off of West Irene Road tying into a proposed access road running south to the project site. The estimated time of completion is 455 calendar days, after receipt of notice t
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Road
- Location
- Zachary, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Comite Brooks Lake Control Structure and Guide Levee
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The w ork consists of constructing a guide levee, access ramp, a closure structure, w hich includes a 54 pipe, headw all, and flap gate, turf establishment, and improving an existing access road off of West Irene Road tying into a proposed access road running south to the project site. The estimated time of completion is 455 calendar days, after receipt of notice t |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Zachary |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Road |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
