Command & Control Facility Phase 3 Parking Structure
Sector: Water Supply and Storage • Location: Honolulu, Hawaii, United States of America
Source: Dodge USA
Project Description: Construct a multi-storied concrete structure next to an existing waterway and separate surface parking lots for approximately 1,000 parking spots for the Command and Control Facility Complex located on Fort Shafter, Oahu, Hawaii. Work will consist of constructing a new Road; site and streambank stabilization; up to five stories plus a roof level for the concrete Parking Garage
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Car parking, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Honolulu, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Command & Control Facility Phase 3 Parking Structure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: Construct a multi-storied concrete structure next to an existing waterway and separate surface parking lots for approximately 1,000 parking spots for the Command and Control Facility Complex located on Fort Shafter, Oahu, Hawaii. Work will consist of constructing a new Road; site and streambank stabilization; up to five stories plus a roof level for the concrete Parking Garage and two surface Parking Lots; as well as necessary site, and utilities infrastructure work; in a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Honolulu |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Car parking, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
