Command & Control Facility Phase 3 Parking Structure
One of 8,718 projects Taiyo tracks in Hawaii.
Source: Dodge USA
Project Description: Construct a multi-storied concrete structure next to an existing waterway and separate surface parking lots for approximately 1,000 parking spots for the Command and Control Facility Complex located on Fort Shafter, Oahu, Hawaii. Work will consist of constructing a new Road; site and streambank stabilization; up to five stories plus a roof level for the concrete Parking Garage
- Status
- Under Construction
- Sector
- Road, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Water Supply and Storage, Car parking, Cement, Automotive
- Location
- Honolulu, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Command & Control Facility Phase 3 Parking Structure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: Construct a multi-storied concrete structure next to an existing waterway and separate surface parking lots for approximately 1,000 parking spots for the Command and Control Facility Complex located on Fort Shafter, Oahu, Hawaii. Work will consist of constructing a new Road; site and streambank stabilization; up to five stories plus a roof level for the concrete Parking Garage and two surface Parking Lots; as well as necessary site, and utilities infrastructure work; in a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Honolulu |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Water Supply and Storage, Car parking, Cement, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
