logo
ProjectStart

Commercial Building Alteration

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Work In Suite To Include Framing/Drywall/Plumbing/Electrical/Hvac Within The Existing Core And Shell Of Building. Update Fire Alarm And Sprinkler As Needed. All New Finishes. 2228 Sqft On First Floor And 15000 Sqft On Second Floor Total Square Feet: 2228

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
Location
Boulder, Colorado, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Commercial Building Alteration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Commercial Building Alteration” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Boulder, Colorado, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Work In Suite To Include Framing/Drywall/Plumbing/Electrical/Hvac Within The Existing Core And Shell Of Building. Update Fire Alarm And Sprinkler As Needed. All New Finishes. 2228 Sqft On First Floor And 15000 Sqft On Second Floor Total Square Feet: 2228

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Boulder

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project