Commercial Building Alteration
Sector: Power Generation (CCGT) • Location: Raleigh, North Carolina, United States of America
Source: Dodge
Ste 120 1047 Sf B Occ Building Is 4 Story 1-B Const Business Occ 105408 Sf Sprinkler And Standpipe Interior Alteration To Include Updating Finishes, New Sink, New Electrical Per Tenant Requirements. All Walls And Ceiling To Remain As Is
- Status
- Prospective
- Sector
- Power Generation (CCGT), Residential, Commercial, Manufacturing (Industrial)
- Location
- Raleigh, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Commercial Building Alteration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ste 120 1047 Sf B Occ Building Is 4 Story 1-B Const Business Occ 105408 Sf Sprinkler And Standpipe Interior Alteration To Include Updating Finishes, New Sink, New Electrical Per Tenant Requirements. All Walls And Ceiling To Remain As Is |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Raleigh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
