Commercial Building Floor 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Interior build-out of commercial space - minor partition work, new restaurant equipment and fixtures, lighting and HVAC. no change to use, egress, or occupancy. PL filed under subsequent application. Interior demolition and ST repairs under job Q01019034
- Status
- Prospective
- Sector
- Consumer Products, Residential, Raw Materials, Commercial
- Location
- Sunnyside, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Commercial Building Floor 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Interior build-out of commercial space - minor partition work, new restaurant equipment and fixtures, lighting and HVAC. no change to use, egress, or occupancy. PL filed under subsequent application. Interior demolition and ST repairs under job Q01019034 |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Sunnyside |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Residential, Raw Materials, Commercial |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
