Commercial Building Ti
Sector: Solar • Location: Mesa, Arizona, United States of America
Source: Dodge
EXPEDITE - Paluo Solar Building D - Tenant Improvement Assembling of solar panels, shipping and receiving. This tenant improvement project will be done in 2 different phases. This submittal is phase 1 to include onsite utilities in the private yard, addition of utility building in private yard, structural package for interior walls and ceiling supports (for future ceilings) and infrastructure for
- Status
- Prospective
- Sector
- Solar, Chemical (Industrial), Commercial, Seaport, Residential, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Mesa, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Commercial Building Ti
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | EXPEDITE - Paluo Solar Building D - Tenant Improvement Assembling of solar panels, shipping and receiving. This tenant improvement project will be done in 2 different phases. This submittal is phase 1 to include onsite utilities in the private yard, addition of utility building in private yard, structural package for interior walls and ceiling supports (for future ceilings) and infrastructure for the construction of the secondary containment pit/walls and lid for the future H-3 chemical stora... |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Solar, Chemical (Industrial), Commercial, Seaport, Residential, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
