Commercial Building
Sector: Commercial • Location: San Diego, California, United States of America
Source: Dodge USA
TI, No Structural Work, New non-load bearing partitions only, new suspended ceilings, new light fixtures, HVAC/mechaincal is existing and electrical is existing, demo break sink, replace break sink, new toilets, new lavatory sinks, 12 new exam procedure and lab sinks, new water heater and janitor sink
- Status
- Under Construction
- Sector
- Commercial, Water Supply and Storage, Power Generation (CCGT), Residential, Manufacturing (Industrial)
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | TI, No Structural Work, New non-load bearing partitions only, new suspended ceilings, new light fixtures, HVAC/mechaincal is existing and electrical is existing, demo break sink, replace break sink, new toilets, new lavatory sinks, 12 new exam procedure and lab sinks, new water heater and janitor sink |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Generation (CCGT), Residential, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
