Commercial Building
Start · North Carolina · Last reported Feb 2025
Source: Dodge
Remodel existing building interior. Shorten bar, install new wall framing or delete other interior walls. Relocate plumbing and electrical fixtures. Add one branch of 6" ductwork to newly created room. No change in building footprint. Number Of Stories Above Grade: 1
- Status
- Prospective
- Sector
- Consumer Products, Power Generation (CCGT), Raw Materials, Commercial, Residential
- Location
- Wilmington, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remodel existing building interior. Shorten bar, install new wall framing or delete other interior walls. Relocate plumbing and electrical fixtures. Add one branch of 6" ductwork to newly created room. No change in building footprint. Number Of Stories Above Grade: 1 |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wilmington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Power Generation (CCGT), Raw Materials, Commercial, Residential |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
