Commercial Building
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge USA
Project Title: Remodeling The Interior Of The Unit 2 Or Suite B Of The Building. Mainly Will Be Adding Additional Walls To Create More Private Offices. We Will Also Be Relocating One Exterior Door And One Sink. Hvac And Electrical Will Be Updated As Necessary. Replacement Of Ceiling Tiles And Carpet.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial, Power Generation (CCGT)
- Location
- Eau Claire, Wisconsin, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project Title: Remodeling The Interior Of The Unit 2 Or Suite B Of The Building. Mainly Will Be Adding Additional Walls To Create More Private Offices. We Will Also Be Relocating One Exterior Door And One Sink. Hvac And Electrical Will Be Updated As Necessary. Replacement Of Ceiling Tiles And Carpet. |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Eau Claire |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial, Power Generation (CCGT) |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
