Commercial Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Replacement of existing condensing unit on grade. Replacement of existing air handling unit in existing equipment room on 4th floor. Replacement of existing lineset per plans. No change to occupancy, use, or egress.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- Todt Hill, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of existing condensing unit on grade. Replacement of existing air handling unit in existing equipment room on 4th floor. Replacement of existing lineset per plans. No change to occupancy, use, or egress. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Todt Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
