Commercial Building
Sector: Waste Processing and Treatment • Location: Renton, Washington, United States of America
Source: Dodge
Argo Renton Llc Ste B Renton Ross Shell- New Demising Walls For New Mechanical Room. Provide Exterior Door, Stair And Landing For Access To New Room. Relocate Sewage Pump To New Room For Use By Existing Two Tenants. Return To Shell Condition For New Future Tenant. Fire Sprinkler Permit Required.
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Residential, Manufacturing (Industrial), Commercial
- Location
- Renton, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Argo Renton Llc Ste B Renton Ross Shell- New Demising Walls For New Mechanical Room. Provide Exterior Door, Stair And Landing For Access To New Room. Relocate Sewage Pump To New Room For Use By Existing Two Tenants. Return To Shell Condition For New Future Tenant. Fire Sprinkler Permit Required. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Renton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
