logo
ProjectStart

Commercial Building

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Altc2331497 (Cnv: Ds) Plan Approval: Final Reviewed For Compliance Under: 2017 Obc And Icc A117.1-2009 With Modifications In Obc 1112.0. Work Requiring Separate Applications: None Work Requiring Separate Trade Permits: Electrical / Plumbing Work Not Applicable: Mechanical / Fire Alarm / Fire Suppression Project Use/Occupancy /Separation: F-2 Building Use/Occupancy /Separation: F-2 Construction Typ

Status
Prospective
Sector
Water Supply and Storage, Residential, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial
Location
Columbus, Ohio, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Commercial Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Commercial Building” is an infrastructure initiative in the Water Supply and Storage sector, located in Columbus, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Altc2331497 (Cnv: Ds) Plan Approval: Final Reviewed For Compliance Under: 2017 Obc And Icc A117.1-2009 With Modifications In Obc 1112.0. Work Requiring Separate Applications: None Work Requiring Separate Trade Permits: Electrical / Plumbing Work Not Applicable: Mechanical / Fire Alarm / Fire Suppression Project Use/Occupancy /Separation: F-2 Building Use/Occupancy /Separation: F-2 Construction Type: I-B Description Of Work: Remodel Of An Existing City Of Columbus Storm Water Control Building....

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Columbus

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project