Commercial Building
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
665 Sqft Tenant Improvement The Project Consists Of Opening Of (2) Exterior Man Door-Type Exits As Additional Accessibility Modifications To Create A More Barrier Free Environment And To Make General Space Modifications For The (N) Tenant Mechanical And Electrical Under Separate Permits As Per Approved Plans
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Consumer Products
- Location
- Fullerton, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 665 Sqft Tenant Improvement The Project Consists Of Opening Of (2) Exterior Man Door-Type Exits As Additional Accessibility Modifications To Create A More Barrier Free Environment And To Make General Space Modifications For The (N) Tenant Mechanical And Electrical Under Separate Permits As Per Approved Plans |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fullerton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Consumer Products |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
