Commercial Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The scope of work includes interior remodeling to convert open office area to a testing area. Install new rooftop equipment - chiller and water tank on existing rooftop. There are sufficient no. of standard and accessible parking spaces and accessible restrooms provided by property owner. New finishes shall be provided throughout unless noted.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Car parking, Manufacturing (Industrial), Residential, Automotive
- Location
- Santa Clara, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes interior remodeling to convert open office area to a testing area. Install new rooftop equipment - chiller and water tank on existing rooftop. There are sufficient no. of standard and accessible parking spaces and accessible restrooms provided by property owner. New finishes shall be provided throughout unless noted. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Clara |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Car parking, Manufacturing (Industrial), Residential, Automotive |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
