Commercial Building
Start · New York · Last reported Dec 2024
Source: Dodge USA
INTERIOR ALTERATION, REMOVAL OF NON-LOAD BEARING PARTITIONS, INSTALL NEW CEILING TILES, RELOCATE DOORS AND INSTALL PATCHED FLOORING THROUGHOUT AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Square Feet) 1200
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Residential, Road
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | INTERIOR ALTERATION, REMOVAL OF NON-LOAD BEARING PARTITIONS, INSTALL NEW CEILING TILES, RELOCATE DOORS AND INSTALL PATCHED FLOORING THROUGHOUT AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Square Feet) 1200 |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential, Road |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
