Commercial Building
Sector: Power Generation (CCGT) • Location: Raleigh, North Carolina, United States of America
Source: Dodge
ALT - Indivior -4800 SF B OCC Building 2 Lab & Restroom Fit Out - Demolish existing walls, ceilings, and HVAC. Install new rooftop exhaust fans. Renovate to create new lab spaces with casework, new restrooms, expanded office area, and corridor spaces. Renovations include architectural modifications and finishes, HVAC upgrades, fire sprinkler and alarm services, and electrical and controls upgrades
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential
- Location
- Raleigh, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Commercial Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ALT - Indivior -4800 SF B OCC Building 2 Lab & Restroom Fit Out - Demolish existing walls, ceilings, and HVAC. Install new rooftop exhaust fans. Renovate to create new lab spaces with casework, new restrooms, expanded office area, and corridor spaces. Renovations include architectural modifications and finishes, HVAC upgrades, fire sprinkler and alarm services, and electrical and controls upgrades.BY\UILDFING IS 1 STORY B OCC 2-B CONST SPRINKLERS 18612 SF Total Square Feet: 4800 |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Raleigh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
