Commercial Development Phase 1
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
a part of Phase I, the applicant proposes to construct a 4,988 square foot gas station area, which would include eight stations (16-pumps), a 5800 square foot convenience store, a 2,866 square foot drive-thru car wash, and twenty (20) designated EV (Tesla) charging spaces under two (2) covered canopies within the parking area
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Residential
- Location
- Yucaipa, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Commercial Development Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | a part of Phase I, the applicant proposes to construct a 4,988 square foot gas station area, which would include eight stations (16-pumps), a 5800 square foot convenience store, a 2,866 square foot drive-thru car wash, and twenty (20) designated EV (Tesla) charging spaces under two (2) covered canopies within the parking area |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Yucaipa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
