Commercial Street Bridge Replacement Project
Sector: Commercial • Location: Pittsburgh, Pennsylvania, United States
Source: Pittsburgh Magazine
A 25-day closure of a section of I-376 as part of the Commercial Street Bridge Replacement Project in Pittsburgh. The project involves accelerated construction with short-term closure but long-term benefits. A specialized 511PA website and app provide real-time traffic information and detour guidance to help drivers navigate the closure.
- Status
- Under Construction
- Sector
- Commercial, Bridge
- Location
- Pittsburgh, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Pittsburgh Magazine
ConstructChat
Ask ConstructChat about Commercial Street Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 25-day closure of a section of I-376 as part of the Commercial Street Bridge Replacement Project in Pittsburgh. The project involves accelerated construction with short-term closure but long-term benefits. A specialized 511PA website and app provide real-time traffic information and detour guidance to help drivers navigate the closure. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Pittsburgh |
Source
Source | Pittsburgh Magazine |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge |
Article published date | 2026-07-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
