Commercial Street Bridge Replacement
Sector: Tunnel • Location: Pittsburgh, Pennsylvania, United States
Source: Pittsburgh Post-Gazette
Replacement of the Commercial Street Bridge just outside the outbound Squirrel Hill Tunnel on the Parkway East. The new bridge is being built beside the existing structure and will be jacked into place during a 25-day closure of the highway scheduled to begin July 10, 2026. This method minimizes traffic disruptions compared to other methods.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Replacement of the Commercial Street Bridge just outside the outbound Squirrel Hill Tunnel on the Parkway East. The new bridge is being built beside the existing structure and will be jacked into place during a 25-day closure of the highway scheduled to begin July 10, 2026. This method minimizes traffic disruptions compared to other methods. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
