Commonwealth LNG 9.5 Mtpa LNG Facility
Sector: Natural Gas • Location: Cameron Parish, Louisiana, USA
Source: GlobeNewswire
The Commonwealth LNG project involves the construction of a 9.5 million tons per annum liquefied natural gas (LNG) export terminal in Cameron Parish, Louisiana, USA. The project uses a modular construction approach with six identical liquefaction trains based on Technip Energies' SnapLNG modular and scalable solution, aiming to accelerate schedule and optimize costs.
- Status
- Under Construction
- Sector
- Natural Gas, LNG
- Location
- Cameron Parish, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- GlobeNewswire
ConstructChat
Ask ConstructChat about Commonwealth LNG 9.5 Mtpa LNG Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Commonwealth LNG project involves the construction of a 9.5 million tons per annum liquefied natural gas (LNG) export terminal in Cameron Parish, Louisiana, USA. The project uses a modular construction approach with six identical liquefaction trains based on Technip Energies' SnapLNG modular and scalable solution, aiming to accelerate schedule and optimize costs. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Cameron Parish |
Source
Source | GlobeNewswire |
URL |
More Details
Record type | Project |
Sector | Natural Gas, LNG |
Article published date | 2025-12-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
