logo

Commonwealth LNG Terminal

Sector: LNG • Location: Cameron Parish, Louisiana, United States

Source: 10/12 Industry Report

Project
Planned

Commonwealth LNG has secured a 20-year supply agreement with Glencore and aims to begin construction in 2025 with production starting by 2029. The proposed terminal has a capacity of 9.5 million tonnes per annum and is located in Cameron Parish, Louisiana.

Status
Prospective
Sector
LNG
Location
Cameron Parish, Louisiana, United States of America
Updated
22 Jul 2026
Source
10/12 Industry Report

ConstructChat

Ask ConstructChat about Commonwealth LNG Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Commonwealth LNG Terminal” is an infrastructure initiative in the LNG sector, located in Cameron Parish, Louisiana, United States. Taiyo aggregates data on it from 10/12 Industry Report.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Commonwealth LNG has secured a 20-year supply agreement with Glencore and aims to begin construction in 2025 with production starting by 2029. The proposed terminal has a capacity of 9.5 million tonnes per annum and is located in Cameron Parish, Louisiana.

Original sector

Energy

Location

Country

United States of America (USA)

State

Louisiana

City

Cameron Parish

Source

Source

10/12 Industry Report

URL

More Details

Record type

Project

Sector

LNG

Article published date

2025-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project