Communication Cabling Removal and Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project scope of work includes the removal of existing low-voltage communication cabling and replacement with new OS2 and OM4 fiber optic cabling and CAT6 copper cabling. Also included in the scope is the addition of one new IDF closet per engineering drawings. Existing fire alarm conduits are out of scope for this project. This project requires a C-7 license.
- Status
- Closed
- Sector
- Broadband, Metal, Telecommunications, Government, Commercial, Manufacturing (Industrial)
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Communication Cabling Removal and Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project scope of work includes the removal of existing low-voltage communication cabling and replacement with new OS2 and OM4 fiber optic cabling and CAT6 copper cabling. Also included in the scope is the addition of one new IDF closet per engineering drawings. Existing fire alarm conduits are out of scope for this project. This project requires a C-7 license. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Metal, Telecommunications, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
