logo

COMMUNICATION III

Sector: Power Generation (CCGT) • Location: Costa Rica

Source: World Bank Group

Project
Closed

The Fourth Power Project will comprise: (1) installation of two gas turbine units of about 15 MW each in an extension of the existing San Antonio power station near San Jose; (2) installation of diesel units with a total capacity of about 3MW at the port of Limon; (3) construction and reinforcement of various transmission lines and substations; (4) engineering studies for the preparation of the Bo

Project Information FAQ

Project Information

5 Q
The project “COMMUNICATION III” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Costa Rica. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Fourth Power Project will comprise: (1) installation of two gas turbine units of about 15 MW each in an extension of the existing San Antonio power station near San Jose; (2) installation of diesel units with a total capacity of about 3MW at the port of Limon; (3) construction and reinforcement of various transmission lines and substations; (4) engineering studies for the preparation of the Borrower's long-range expansion program; the design of a future thermal power plant and the San Jose distribution systems; geological studies for Tapanti and Angostura hydroelectric projects; and advice on the design and construction of the San Jose gas turbine units; (5) management studies of the Borrower's overall organization and operations; and (6) studies of the organization, economy and regulation of the Guarantor's overall power sector. The Third Telecommunications Project will comprise: (1) expansion of the telephone network capacity by approximately 25,000 exchange lines, together with cables and associated plant including mobile radio equipment; (2) increasing the trunk network capacity by approximately 1,000 circuits; and extension of the main trunk exchange by approximately 1,000 lines; (3) the establishment of public-call offices in approximately 600 additional towns and villages from which long-distance telephone calls can be made and telegrams transmitted; (4) expansion of the new national/international telex exchange in San Jose by approximately 350 lines, and 50 additional lines each at the small telex installations in Puntarenas and Limon; and (5) employment of (a) instructors for technical training, and (b) engineering consultants to assist in planning future extension of telex, telegraph and data transmission facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data