logo
ProjectClosed

COMMUNICATION III

Sector: Power Generation (CCGT) • Location: Costa Rica

Source: World Bank Group

The Fourth Power Project will comprise: (1) installation of two gas turbine units of about 15 MW each in an extension of the existing San Antonio power station near San Jose; (2) installation of diesel units with a total capacity of about 3MW at the port of Limon; (3) construction and reinforcement of various transmission lines and substations; (4) engineering studies for the preparation of the Bo

Status
Closed
Sector
Power Generation (CCGT), Wind, Geothermal, Government
Location
Costa Rica
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about COMMUNICATION III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “COMMUNICATION III” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Costa Rica. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Fourth Power Project will comprise: (1) installation of two gas turbine units of about 15 MW each in an extension of the existing San Antonio power station near San Jose; (2) installation of diesel units with a total capacity of about 3MW at the port of Limon; (3) construction and reinforcement of various transmission lines and substations; (4) engineering studies for the preparation of the Borrower's long-range expansion program; the design of a future thermal power plant and the San Jose distribution systems; geological studies for Tapanti and Angostura hydroelectric projects; and advice on the design and construction of the San Jose gas turbine units; (5) management studies of the Borrower's overall organization and operations; and (6) studies of the organization, economy and regulation of the Guarantor's overall power sector. The Third Telecommunications Project will comprise: (1) expansion of the telephone network capacity by approximately 25,000 exchange lines, together with cables and associated plant including mobile radio equipment; (2) increasing the trunk network capacity by approximately 1,000 circuits; and extension of the main trunk exchange by approximately 1,000 lines; (3) the establishment of public-call offices in approximately 600 additional towns and villages from which long-distance telephone calls can be made and telegrams transmitted; (4) expansion of the new national/international telex exchange in San Jose by approximately 350 lines, and 50 additional lines each at the small telex installations in Puntarenas and Limon; and (5) employment of (a) instructors for technical training, and (b) engineering consultants to assist in planning future extension of telex, telegraph and data transmission facilities.

Original sector

Information and Communications Technologies

Location

Country

Costa Rica

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind, Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project