Communication Lines Larger Planned Phase 1 IQC
Sector: Broadband • Location: Rochester, Washington, United States of America
Source: Dodge USA
The current project is considered phase 1 of a larger planned project spanning two counties. Phase 1 is located in northern Rochester Washington to Littlerock Washington. The entire project is located within Thurston County, Washington State. The area is currently unserved by broadband services and phase 1 will deliver XGSPON FTTH service to 851 subscribers. The total project is 198,091 LFT of fib
- Status
- Closed
- Sector
- Broadband, Road, Telecommunications, Commercial, Manufacturing (Industrial)
- Location
- Rochester, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Communication Lines Larger Planned Phase 1 IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The current project is considered phase 1 of a larger planned project spanning two counties. Phase 1 is located in northern Rochester Washington to Littlerock Washington. The entire project is located within Thurston County, Washington State. The area is currently unserved by broadband services and phase 1 will deliver XGSPON FTTH service to 851 subscribers. The total project is 198,091 LFT of fiber route construction. 128,233 LFT of aerial strand and lash fiber construction and 99,450 LFT of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Rochester |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Road, Telecommunications, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
