Community Building Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work of the project includes construction of a Fire Hall utilizing a pre-manufactured steel structure with an area of 4,800 square feet. Miscellaneous work includes utilities to the points of connection, paving, and city sidewalks Design and construction services for the community center project.
- Status
- Closed
- Sector
- Steel, Government, Manufacturing (Industrial), Commercial, Car parking, Power Transmission, Power Generation (CCGT), Automotive, Metal
- Location
- Elk Creek, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Community Building Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work of the project includes construction of a Fire Hall utilizing a pre-manufactured steel structure with an area of 4,800 square feet. Miscellaneous work includes utilities to the points of connection, paving, and city sidewalks Design and construction services for the community center project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Elk Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Government, Manufacturing (Industrial), Commercial, Car parking, Power Transmission, Power Generation (CCGT), Automotive, Metal |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
