Community Centre Expansion Project
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
- To provide accessible, barrier free washrooms, showers and change rooms for the Community Centre 2. To provide an accessible studio space that can be utilized for diversified uses such as yoga, or a meeting place for seniors/youth 3. To provide an accessible fitness space geared to all demographics to ensure physical, social and emotional health amongst the residents of Asphodel-Norwood and the
- Status
- Closed
- Sector
- Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Community Centre Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. To provide accessible, barrier free washrooms, showers and change rooms for the Community Centre 2. To provide an accessible studio space that can be utilized for diversified uses such as yoga, or a meeting place for seniors/youth 3. To provide an accessible fitness space geared to all demographics to ensure physical, social and emotional health amongst the residents of Asphodel-Norwood and the 6 neighbouring/bordering municipalities who currently participate at the Community Centre The Community Centre Expansion Project includes a 3,500 square foot expansion to the Asphodel-Norwood Community Centre. The expansion will include a 545 square foot diverse studio space a 1,155 square foot fitness space with the remaining 1,800 square feet to provide the space for two separate areas that include accessible showers, accessible change rooms, accessible washrooms and a barrier free vestibule entrance. The fitness space will boast 20 pieces of equipment for all ages. Residents of Asphodel-Norwood and 6 other local municipalities currently utilize the Asphodel-Norwood Community Centre, these include: Township of Selwyn, The Township of Douro-Dummer, The Township of Otonabee-South-Monaghan, The Township of Havelock-Belmont-Methuen, The Municipality of Trent Hills and the Municipality of Marmora and Lake. The expansion will also be utilized by the residents of the same municipalities. The total population of all seven municipalities is 55,931. |
Original sector | Community, Culture and Recreation |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Canada
- Headingley Water Treatment Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- St. Stephen Border Crossing
- Surgeon Lieutenant-Commander W. Anthony Paddon Building
- McMath Secondary School
- Niagara Falls Entertainment Centre
- Anzac Water Reservoir and Pump Station
- Toronto Airport Piers D and E Fixed Bridges
