logo
ProjectConstruction Documents

Commwell Health Site Development Phase 2

Construction documents · North Carolina · Last reported Aug 2025

Source: Dodge

Phase 2 Site Development CommWell Health The Project includes the site development package of 27.65 acres inclusive of all roadways, stormwater, utility work and pump station.

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT), Commercial, Water Supply and Storage
Location
Four Oaks, North Carolina, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Commwell Health Site Development Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Commwell Health Site Development Phase 2” is an infrastructure initiative in the Power Transmission sector, located in Four Oaks, North Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction documents

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Phase 2 Site Development CommWell Health The Project includes the site development package of 27.65 acres inclusive of all roadways, stormwater, utility work and pump station.

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Four Oaks

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Commercial, Water Supply and Storage

Article published date

2025-08-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project