logo

Comoros Solar Energy Integration Platform

Sector: Solar • Location: Comoros

Source: World Bank

Project
Closed

The objective of the Solar Energy Integration Platform Project for Comoros is to improve the commercial performance of the electric utility and its capacity to dispatch variable renewable energy. The project has four components. 1. Investment in Power Storage, Pilot Photovoltaic (PV), and System Upgrades component will finance around 9 MWp (Megawatt Peak) of PV on a pilot basis on Grande Comore at

Project Information FAQ

Project Information

5 Q
The project “Comoros Solar Energy Integration Platform” is an infrastructure initiative in the Solar sector, located in Comoros. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Solar Energy Integration Platform Project for Comoros is to improve the commercial performance of the electric utility and its capacity to dispatch variable renewable energy. The project has four components. 1. Investment in Power Storage, Pilot Photovoltaic (PV), and System Upgrades component will finance around 9 MWp (Megawatt Peak) of PV on a pilot basis on Grande Comore at one of the 11 prospective solar sites identified as part of project preparation. The facility is expected to displace around 13 GWh of diesel-based thermal generation every year. 2. SONELEC (National Comorian Electricity Company) Commercial and Financial Recovery component will strengthen SONELEC’s financial performance by improving billing and metering infrastructure, as well as targeted consumer awareness campaigns. This component has two subcomponents. Subcomponent 2.1: Geographical expansion and enhancements of SONELEC’s commercial management system (CMS). The ESRP has financed the implementation of a state-of-the-art hardware and software infrastructure for SONELEC’s new CMS covering all customers on Grande Comore and Mohéli to ensure the streamlining of billing and collection activities and fully integrating the new prepaid metering infrastructure. The 2.2. subcomponent will take care of the rollout of advanced metering infrastructure. The Electricity Sector Recovery Project (ESRP) had piloted the installation of 1,000 prepaid low-voltage meters and 400 smart three-phase meters of different types. Consequently, the project will support the mainstreaming of prepaid meters by installing 95,000 additional split-type meters on all three islands, which will have a considerable impact on strengthening the sustainability of SONELEC's revenues and cash flow. 3. Technical Assistance, Project Implementation support, and capacity building component has four subcomponents. 3.1. Subcomponent will provide the project implementation support. Experience with the energy sector in the Comoros has shown that significant support for project coordination and implementation is necessary due to low capacity and significant historic sector governance challenges. 3.2. Training and capacity building in transmission and dispatch system operations and maintenance subcomponent will support the transition from SONELEC’s current short-term oriented approach that restricts private sector participation to the implementation of turnkey contracts for the construction of new generation capacity. This subcomponent will include the financing to engage private sector operators in the Operations and Maintenance (O and M) of the three islands’ dispatch systems for a duration of three years, in addition to the PV plus storage O and M provided for under Component 1. SONELEC’s technical staff will be trained during that period to carry out future O and M activities once the contracts with private sector have expired. 3.3. subcomponent will focus on the expansion of gender-based communication and awareness campaigns. The recently completed ESRP was successful in increasing women’s awareness and advocating the value of formal electricity connections and the importance of paying electricity bills. 3.4. Technical assistance for sector governance and renewable energy development subcomponent will provide support to the key energy sector institutions through the hiring of external experts and the provision of training. 4. Contingent Emergency Response Component (CERC) with zero allocation may be used to contribute to an emergency response through the timely implementation of activities in response to an eligible national emergency. The CERC can also be used to channel additional funds if they become available as a result of said emergency. For the Comorian energy sector, emergency conditions may arise subsequent to extreme weather events including cyclones and flooding or economic disruption including fuel import shortages.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data