Compañías Asociadas Petroleras S.A.
Sector: Oil and Gas • Location: Argentina
Source: Inter-American Development Bank (IADB)
Compañías Asociadas Petroleras S.A. (CAPSA) was established in 1977 and is engaged in the exploration, exploitation, development, and production of oil and gas it obtains from its own oil fields located in the Comodoro Rivadavia region, close to San Jorge bay in Chubut. CAPSA produces 10,500 bbl/day and has broad experience in developing mature oil fields. Its first acquisition was the Diadema fie
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in implementation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Compañías Asociadas Petroleras S.A. (CAPSA) was established in 1977 and is engaged in the exploration, exploitation, development, and production of oil and gas it obtains from its own oil fields located in the Comodoro Rivadavia region, close to San Jorge bay in Chubut. CAPSA produces 10,500 bbl/day and has broad experience in developing mature oil fields. Its first acquisition was the Diadema field. This field represents 90% of CAPSA’s reserves and production. CAPSA now operates 7 oil fields and has 65.7 million barrels of proven reserves.Currently, 80% of daily petroleum production comes from wells using secondary recovery techniques. Encouraging results from these projects led the company to continue investing in this line. CAPSA has demonstrated capability and knowledge in the use of secondary recovery techniques. In September 2007, CAPSA began a pilot polymer injection project in 5 injection wells and a response was obtained in 16 productive wells. Good results from this pilot assisted recovery project encourages CAPSA to continue the expansion of this project.CAPSA’s investment plan provides for the following components: (a) expansion of the pilot assisted recovery project by increasing the polymer injection wells from 5 to 10 and drilling 10 new intermediate wells (in fill wells) to be located within the project area, for a total cost of US$35.4 million, and (b) drilling of 20 advanced/step-out wells where proven reserves are found, for a cost of US$19.1 million. In addition, and in order to have more funds available for executing the investment plan, CAPSA will refinance a loan granted by Deutsche Bank for US$17.5 million, coming due between 2010 and 2011.To develop part of its investment plan, CAPSA has sought financing from the IIC for US$8 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
