logo

Companhia Ferroviaria do Nordeste S.A.

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

In July 1997, Companhia Ferroviaria do Nordeste S.A. (CFN) won a 30-year concession to rehabilitate and operate the 4,534 km northeast section of the national railway system. In 1995, the Brazilian government decided to divide the national railway, RFFSA, into six exclusive regional systems and to offer a 30-year concession contract for each system. The first concession was awarded in March 1996 a

Status
Prospective
Sector
Mass Transit, Government, Rail, Steel, Manufacturing (Industrial), Metal
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Companhia Ferroviaria do Nordeste S.A.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Companhia Ferroviaria do Nordeste S.A.” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In July 1997, Companhia Ferroviaria do Nordeste S.A. (CFN) won a 30-year concession to rehabilitate and operate the 4,534 km northeast section of the national railway system. In 1995, the Brazilian government decided to divide the national railway, RFFSA, into six exclusive regional systems and to offer a 30-year concession contract for each system. The first concession was awarded in March 1996 and the sixth in July 1997. Concessions were awarded on the basis of the highest bid above the government's minimum price. The concessionaire paid US$ 14.6 million for the concession rights. Unlike in Argentina, concessionaires have no control over initial employment decisions. CFN comprised: recently privatized mining company, Companhia Vale do Rio Doce (CVRD); industrial group, Vicunha; and Brazil's largest steel-maker, Cia Siderurgica Nacional. The sponsors are all railway customers. The consortium plans to invest US$ 36 million during the next five years, and more during the following 5 years if traffic volumes increase. Prior to takeover by the consortium the government reduced staff levels by 40%. The Brazilian Federal Development Bank (BNDES) approved a US$ 46.6 million loan to the construction works in February 1999 (R$ 79.3 million - 25% of the total investment); the remaining costs will be financed by Finor (50%) and with the sponsors' own resources (25%). In 2003, CVRD sold its stake in CFN to Cia Siderurgica Nacional and to Taquari Participacoes (a company of the Vicunha Group). After the transaction, Cia Siderurgica Nacional and Vincunha were holding 50% of the shares of CFN each. In 2008, CFN changed its name to Transnordestina Logística, a wholly-owned subsidiary of CSN. In 2009, Transnordestina started the expansion of the railway, which was expected to increase its capacity from 1,5 million tons per year to 30 million tons per year (the new segment length was set at 1728 km). The investment was estimated at US$ 2.7 billion (BRL 5.4 billion) to be financed with the sponsors' own resources (40%) and resources from federal government institution Sudene (49%), BNDES (4%), BNB (3%) and state-owned company Valec (3%). The construction works started in December 2009 and were still underway as of 2012. The investments undertaken by CFN, year by year were: 1998 – US$ 2.4 million (R$ 2.9 million) 1999 – US$ 5.6 million (R$ 10.1 million) 2000 – US$ 4.1 million (R$ 8 million) 2001 - US$ 9.3 million (R$ 20.7) 2002 – US$ 4.8 million (R$ 16.9 million)

Original sector

Transport

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Government, Rail, Steel, Manufacturing (Industrial), Metal

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project