logo

Companie Energie Electrique du Togo

Sector: Power Transmission • Location: Togo

Source: World Bank Group

Project
Concluded

In April of 1997, Mazard & Guerard, a French auditing firm, signed a one year managment contract to run the state owned vertically integrated power utility, Compangnie Energie Electrique du Togo (CEET). The golas of the management contract were: 1) termination of the current CEET management, 2) analysis of the existing situation, 3) interim management of CEET prior to its privatization. The valu

Project Information FAQ

Project Information

4 Q
The project “Companie Energie Electrique du Togo” is an infrastructure initiative in the Power Transmission sector, located in Togo. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

concluded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In April of 1997, Mazard & Guerard, a French auditing firm, signed a one year managment contract to run the state owned vertically integrated power utility, Compangnie Energie Electrique du Togo (CEET). The golas of the management contract were: 1) termination of the current CEET management, 2) analysis of the existing situation, 3) interim management of CEET prior to its privatization. The value of the contract was estimated at euro 738,000 and was financed by the World Bank. The power sector in Togo was under the responsibility of the Ministry of Equipment, Transport, and Posts and Telecommunications (METPT). Since 1968, Benin and Togo created a joint company (the Communaute Electrique du Benin, CEB) which bought electricity in bulk from Ghana or Cote d'Ivoire (or at times from both) and resold it to the national power companies of Benin (the Societe Beninoise d'Electricite et d'Eau, SBEE) and Togo (the Companie Energie Electrique du Togo, CEET). CEET was principally a distribution company, but it also operated some power stations, including the Centrale Thermique de Lome (CTL). The contract was initally supposed to last just one year. However, delays in the privatization process resulted in the contract lasting until December of 2000. Elyo, a subsidiary of France’s Lyonnaise des Eaux (later renamed Suez), won the international tender for CEET by offering the highest evaluated bid (US$31.7 million). Elyo established Togo Electricite to implement the concession and took control of operations on December 1, 2000.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data