logo
ProjectOpenBP

COMPAR 25 Arlington ST

Sector: Water Supply and Storage • Location: Brighton, Massachusetts, United States of America

Source: City of Boston

St. Columbkille School -;;The Site currently consists of an existing School building and associated Parking, circulation, and landscaping.; Redevelop approximately 1.65 acres of the existing Parking area in order to construct a synthetic turf recreational field, basketball court, playground, enhanced pedestrian access, landscaping and improved parking and circulation. No modifications to the exist

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Car parking, Commercial, Government, Automotive
Location
Brighton, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about COMPAR 25 Arlington ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “COMPAR 25 Arlington ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Brighton, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

St. Columbkille School -;;The Site currently consists of an existing School building and associated Parking, circulation, and landscaping.; Redevelop approximately 1.65 acres of the existing Parking area in order to construct a synthetic turf recreational field, basketball court, playground, enhanced pedestrian access, landscaping and improved parking and circulation. No modifications to the existing School building are proposed.; Project will result in the conversion of approximately 0.52 acres of existing paved surfaces to pervious surfaces consisting of new landscaping, gardening areas, and turf field surfaces. The Project will utilize existing water, sewer and storm drain connections to the BWSC infrastructure in adjacent rights-of-way. The Project includes improvements to the Site stormwater management system in accordance with BWSC requirements.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Brighton

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Car parking, Commercial, Government, Automotive

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project