logo

Complete 540 Phase 1

Sector: Bridge • Location: North Carolina, United States of America

Source: Federal Highway Administration (FHWA)

Project
Closed

The project is designed to extend the Triangle Expressway 28.4 miles from the NC 55 Bypass in Apex to U.S. 64/US 264 (I-87) in Knightdale, completing the 540 Outer Loop around the greater Raleigh area. Phase I of the project, known as the Southern Extension, will provide the final segments of the 540 Outer Loop. The extension will have six travel lanes (three in each direction), a 70-foot wid

Project Information FAQ

Project Information

5 Q
The project “Complete 540 Phase 1” is an infrastructure initiative in the Bridge sector, located in North Carolina, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is designed to extend the Triangle Expressway 28.4 miles from the NC 55 Bypass in Apex to U.S. 64/US 264 (I-87) in Knightdale, completing the 540 Outer Loop around the greater Raleigh area. Phase I of the project, known as the Southern Extension, will provide the final segments of the 540 Outer Loop. The extension will have six travel lanes (three in each direction), a 70-foot wide median, and a posted speed limit of 70 mph. It will extend the Triangle Expressway from its southern terminus by 17.1 miles and will include interchanges at NC 55 Bypass, Holly Springs Road, Bells Lake Road, US 401, Old Stage Road, NC 50, I-40/US 70 (Clayton Bypass), White Oak Road, Rock Quarry Road, US 70 Business, Auburn Knightdale Road, Poole Road, and US 64/264 (I-495/87). The project also includes 55 bridges, 25 box culverts, and two stream crossings. The Complete 540 Project, which is formally supported by local governments, will improve mobility during peak travel periods and address increased transportation demands on the existing roadway network, linking Apex, Cary, Clayton, Garner, Fuquay-Varina, Holly Springs, and Raleigh. The project avoids impacts to the Swift Creek watershed critical area (a source for Raleigh’s drinking water), Clemmons Educational State Forest, and historic resources. The new freeway, by linking metropolitan and rural areas of North Carolina together, will also help bring new jobs and opportunities to the regional business community. Construction is likely to be completed by 2027 in three segments and, depending on available funding, each segment will likely have different construction timelines. The first segment will be from US 401 and I-40, the second from NC 55 Bypass and US 401, and the third from I-40 to US 64/264 (I-495/87).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data