Complete 540 Phase 1
Sector: Bridge • Location: North Carolina, United States of America
Source: Federal Highway Administration (FHWA)
The project is designed to extend the Triangle Expressway 28.4 miles from the NC 55 Bypass in Apex to U.S. 64/US 264 (I-87) in Knightdale, completing the 540 Outer Loop around the greater Raleigh area. Phase I of the project, known as the Southern Extension, will provide the final segments of the 540 Outer Loop. The extension will have six travel lanes (three in each direction), a 70-foot wid
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is designed to extend the Triangle Expressway 28.4 miles from the NC 55 Bypass in Apex to U.S. 64/US 264 (I-87) in Knightdale, completing the 540 Outer Loop around the greater Raleigh area. Phase I of the project, known as the Southern Extension, will provide the final segments of the 540 Outer Loop. The extension will have six travel lanes (three in each direction), a 70-foot wide median, and a posted speed limit of 70 mph. It will extend the Triangle Expressway from its southern terminus by 17.1 miles and will include interchanges at NC 55 Bypass, Holly Springs Road, Bells Lake Road, US 401, Old Stage Road, NC 50, I-40/US 70 (Clayton Bypass), White Oak Road, Rock Quarry Road, US 70 Business, Auburn Knightdale Road, Poole Road, and US 64/264 (I-495/87). The project also includes 55 bridges, 25 box culverts, and two stream crossings. The Complete 540 Project, which is formally supported by local governments, will improve mobility during peak travel periods and address increased transportation demands on the existing roadway network, linking Apex, Cary, Clayton, Garner, Fuquay-Varina, Holly Springs, and Raleigh. The project avoids impacts to the Swift Creek watershed critical area (a source for Raleigh’s drinking water), Clemmons Educational State Forest, and historic resources. The new freeway, by linking metropolitan and rural areas of North Carolina together, will also help bring new jobs and opportunities to the regional business community. Construction is likely to be completed by 2027 in three segments and, depending on available funding, each segment will likely have different construction timelines. The first segment will be from US 401 and I-40, the second from NC 55 Bypass and US 401, and the third from I-40 to US 64/264 (I-495/87). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
