logo
ProjectAwarded

Complete Coal Handling and Ash Handling System

Sector: Geothermal • Location: Chhattisgarh, India

Source: Big News Network

BTL EPC Ltd has been awarded a contract for the Complete Coal Handling and Ash Handling System at the 2x800 MW (Phase II) Raigarh Ultra Supercritical Thermal Power Plant. The project includes design, engineering, procurement, and installation of systems for efficient material transportation and ash handling.

Status
Closed
Sector
Geothermal, Power Generation (CCGT)
Location
Chhattisgarh, India
Updated
22 Jul 2026
Source
Big News Network

ConstructChat

Ask ConstructChat about Complete Coal Handling and Ash Handling System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Complete Coal Handling and Ash Handling System” is an infrastructure initiative in the Geothermal sector, located in Chhattisgarh, India. Taiyo aggregates data on it from Big News Network.

Participants

Company

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BTL EPC Ltd has been awarded a contract for the Complete Coal Handling and Ash Handling System at the 2x800 MW (Phase II) Raigarh Ultra Supercritical Thermal Power Plant. The project includes design, engineering, procurement, and installation of systems for efficient material transportation and ash handling.

Original sector

Power

Budget

Location

Country

India

State

Chhattisgarh

Source

Source

Big News Network

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT)

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project