Complete Streets Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The scope of work involves designing pedestrian and drainage infrastructure improvements at multiple locations in South San Francisco (specified in Section 2.3), including crosswalks, curb ramps, raised crossings, storm drain modifications, etc. Tasks include (but are not limited to): site assessment, design development, cost estimation, ROW certification (as needed), environmental clearance (as n
- Status
- Closed
- Sector
- Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive
- Location
- South San Francisco, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Complete Streets Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work involves designing pedestrian and drainage infrastructure improvements at multiple locations in South San Francisco (specified in Section 2.3), including crosswalks, curb ramps, raised crossings, storm drain modifications, etc. Tasks include (but are not limited to): site assessment, design development, cost estimation, ROW certification (as needed), environmental clearance (as needed), public outreach and project management. Designs will adhere to ADA compliance and local r... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | South San Francisco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
