Computer back-up system (Phase 1):
Sector: Commercial • Location: Quebec, Canada
Source: Infrastructure Canada
This project involves implementing the network necessary for redundancy of the Longueuil and Saint-Hubert computer rooms and developing the information technology plan for the Réseau de transport de Longueuil (RTL) as a whole. Following the 2016 fire (adjacent to the STL building), the need for information technology (IT) back-up was put forward. The deliverables planned for this initial phase are
- Status
- Closed
- Sector
- Commercial
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Computer back-up system (Phase 1):
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves implementing the network necessary for redundancy of the Longueuil and Saint-Hubert computer rooms and developing the information technology plan for the Réseau de transport de Longueuil (RTL) as a whole. Following the 2016 fire (adjacent to the STL building), the need for information technology (IT) back-up was put forward. The deliverables planned for this initial phase are as follows: 1. Redundancy of the Saint-Hubert and Longueuil computer rooms at network level (switches, system configuration, back-up procedures between rooms, etc.) This work is necessary to use the redundancy features of the new SANs (storage units) installed in 2016. 2. Identify critical services and the IT back-up required for each. Evaluate the requirements to ensure that these services are backed up to the expected level of detail. Implementation of this IT back-up system will take place in 2018. |
Original sector | Public Transit |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Winnipeg East District Police Station
- Illusuak Cultural Centre
- Lowe's Home Improvement Warehouses
- Manitoba Hydro High Voltage Test Facility
- Transport and Rescue Squadron Fixed Wing Hangar - 19 Wing CFB 422 Comox
- Merit Contractors Association Tenant Improvement
- Coca-Cola Centre
- Leaside Village at 85 Laird Drive
