logo
ProjectPre-Design

Conceptual Design Study for State Project

One of 10,000+ projects Taiyo tracks in Minnesota.

Source: Dodge

Design services for 2 to 4-lane conversion project on TH 23 from a location just west of the south junction of TH 71 to a location west of the County Road (CR) 5 interchange where the 4-lane would taper back to a 2-lane highway. The products and services needed for this project include but is not limited to conceptual geometric layouts, hydraulic report with conceptual ponding for permanent stormw

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Road, Commercial
Location
Saint Paul, Minnesota, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Conceptual Design Study for State Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Conceptual Design Study for State Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Saint Paul, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Design services for 2 to 4-lane conversion project on TH 23 from a location just west of the south junction of TH 71 to a location west of the County Road (CR) 5 interchange where the 4-lane would taper back to a 2-lane highway. The products and services needed for this project include but is not limited to conceptual geometric layouts, hydraulic report with conceptual ponding for permanent stormwater and temporary sediment ponds and conceptual sizes as well as adequate outlets, borings for p...

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Saint Paul

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Road, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project