logo

Concession of 5 airport projects in southwest Colombia

Sector: Aerospace & Defense • Location: Colombia

Source: InfraPPPWorld

Project
Project In Planning

The concession involves airport facilities located in the southwest region of Colombia. A Project is a single concession for the Alfonso Bonilla Aragón de Palmira airports and Gerardo Tobar López de Buenaventura, along with Benito Salas de Neiva, Perales de Ibagué and El Eden of Armenia.  The purpose of this project is to manage, adapt, build, expand, operate and maintain the airport infrastructur

Project Information FAQ

Project Information

5 Q
The project “Concession of 5 airport projects in southwest Colombia” is an infrastructure initiative in the Aerospace & Defense sector, located in Colombia. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The concession involves airport facilities located in the southwest region of Colombia. A Project is a single concession for the Alfonso Bonilla Aragón de Palmira airports and Gerardo Tobar López de Buenaventura, along with Benito Salas de Neiva, Perales de Ibagué and El Eden of Armenia.  The purpose of this project is to manage, adapt, build, expand, operate and maintain the airport infrastructure that serves these cities. A concession period is 30 years, which includes a year of pre-construction, six years of construction and 23 years of operation and maintenance. Alfonso Bonilla Aragón de Palmira Airport The works in this terminal are focused on the development of new taxiways and 82,500m2 of expansion in the commercial platform, with a projected area of ​​145,500 m2, new aircraft positions, including remote positions, the development of a new control tower 42.5 meters high, a parking lot in height of 7,000 m2 per floor, 19 new boarding bridges, New national dike of 15,800 m2, new low-cost dam of 7300m2, among other works. A new dike would be built in the terminal for the attention of national flights, new areas would be enabled for baggage claim, new boarding gates and the adequacy of a security system that includes the installation of a new fence and improvements in the system perimeter detection, among others. The new infrastructure would allow the airport to grow in capacity, which would go from being able to serve 8.5 million passengers to 16.2 million passengers at the end of the concession period. Gerardo Tobar López de Buenaventura Airport The interventions at this airport will include the construction of a new 1,720 linear meters runway that will allow the arrival of new aircraft, (currently the runway is 1,200 linear meters), the adaptation of safety zones, the construction of new taxiways and The renovation of the platform. To advance the expansion and modernization of this Airport, additional buildings and infrastructures were also included such as a new control tower, a new fire station and a new terminal building, construction of a turn platform, leveling of runway strips, in addition to the construction of an access road to the parking lot. The new infrastructure would leave it with a capacity to serve about 390,000 passengers a year. Currently, its capacity is 29,500 passengers. Benito Salas de Neiva Airport The main works would be the adaptation of the runway and taxiways, the modernization and expansion of the terminal, the remodeling of the passenger terminal, the installation of new security control, the adaptation of a new access road and the remodeling of 230 parking. The airport's capacity would go from being able to serve 358,000 passengers per year to receive up to 715,000 passengers at the time of the concession. Perales de Ibagué National Airport In the Tolima capital, the works would focus on improving safety, adapting the infrastructure in order to meet the certification requirements required by ICAO, a reconfiguration of the commercial platform and investments to improve lighting is proposed. Being part of the project would potentiate the current capacity of the airport which reaches 385 thousand passengers per year. Armenia Eden Airport El Eden Airport has been reviewed and projected in a way that responds to the conditions and needs of the region that allows it to increase the standards of service quality, safety, the opening of new routes and the arrival of new airlines National and international. The air terminal will allow the region to have a capacity to mobilize up to 1.5 million passengers annually.  

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data