Concrete & Underground Power Work
One of 10,000+ projects Taiyo tracks in Tennessee.
Source: Dodge USA
All Sealed Proposals must be clearly marked: Concrete and Underground Power Work at the South Polk Dump 1.The new pad will need a 4 gravel base and will be 55 ft long and 12ft wide. The concrete pad will be 6 thick 4000PSI concrete with wire & fiber. 2.Existing pad torn out, hauled off and new pad poured same as 1st pad. Pad will be 55ft long and 12 ft wide. 3.Building on site needs to be moved ap
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Power Transmission, Government, Cement
- Location
- Oldfort, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Concrete & Underground Power Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | All Sealed Proposals must be clearly marked: Concrete and Underground Power Work at the South Polk Dump 1.The new pad will need a 4 gravel base and will be 55 ft long and 12ft wide. The concrete pad will be 6 thick 4000PSI concrete with wire & fiber. 2.Existing pad torn out, hauled off and new pad poured same as 1st pad. Pad will be 55ft long and 12 ft wide. 3.Building on site needs to be moved approximately 15 to 20 feet back and set level, underground power ran and hooked up. 4.Underground ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Oldfort |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Power Transmission, Government, Cement |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
