logo
ProjectClosed

Concrete & Underground Power Work

One of 10,000+ projects Taiyo tracks in Tennessee.

Source: Dodge USA

All Sealed Proposals must be clearly marked: Concrete and Underground Power Work at the South Polk Dump 1.The new pad will need a 4 gravel base and will be 55 ft long and 12ft wide. The concrete pad will be 6 thick 4000PSI concrete with wire & fiber. 2.Existing pad torn out, hauled off and new pad poured same as 1st pad. Pad will be 55ft long and 12 ft wide. 3.Building on site needs to be moved ap

Status
Closed
Sector
Power Generation (CCGT), Commercial, Power Transmission, Government, Cement
Location
Oldfort, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Concrete & Underground Power Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Concrete & Underground Power Work” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Oldfort, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

All Sealed Proposals must be clearly marked: Concrete and Underground Power Work at the South Polk Dump 1.The new pad will need a 4 gravel base and will be 55 ft long and 12ft wide. The concrete pad will be 6 thick 4000PSI concrete with wire & fiber. 2.Existing pad torn out, hauled off and new pad poured same as 1st pad. Pad will be 55ft long and 12 ft wide. 3.Building on site needs to be moved approximately 15 to 20 feet back and set level, underground power ran and hooked up. 4.Underground ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Oldfort

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Power Transmission, Government, Cement

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project