logo

Concrete hydrodemolition technology used in Johannesburg bridge rehabilitation

Sector: Cement • Location: Johannesburg, South Africa

Source: Highways Today

Project
Completed

Major structural repairs to the M1 North highway bridges over Oxford and Federation Roads in Johannesburg were recently completed. The removal of superfluous concrete in preparation was made possible through hydrodemolition, which was successfully undertaken by Total Blasting, South Africa’s leading water jetting solutions company. Hydrodemolition technology was employed to remove deteriorated con

Project Information FAQ

Project Information

4 Q
The project “Concrete hydrodemolition technology used in Johannesburg bridge rehabilitation” is an infrastructure initiative in the Cement sector, located in Johannesburg, South Africa. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Major structural repairs to the M1 North highway bridges over Oxford and Federation Roads in Johannesburg were recently completed. The removal of superfluous concrete in preparation was made possible through hydrodemolition, which was successfully undertaken by Total Blasting, South Africa’s leading water jetting solutions company. Hydrodemolition technology was employed to remove deteriorated concrete from the structures without any damage to existing steel reinforcement. Challenges to the hydrodemolition aspect of the project included site access, which was limited due to the nature of the roadworks and construction as well as channeling sufficient water to site in order to feed the pumps, which was managed by using multiple road tankers to carry the water.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data