logo
ProjectClosed

Concrete Maintenance

One of 10,000+ projects Taiyo tracks in South Dakota.

Source: Dodge USA

Such bids are to provide for the following approximate "WORK QUANTITIES": 385 SY Remove Asphalt Concrete Pavement, 20 SY Remove Concrete Pavement, 521.0 Ton Base Course, 136.5 Ton Asphalt Concrete Composite, 20 SY 9 Miscellaneous PCC Pavement, 120 LF 30 RCP Arch Storm Sewer Pipe, 6 EA 30 RCP Arch Sloped End, pipe culvert undercut, controlled density fill, unclassified excavation, epoxy pavement ma

Status
Closed
Sector
Water Supply and Storage, Government, Cement, Commercial, Road, Waste Processing and Treatment
Location
Brookings, South Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Concrete Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Concrete Maintenance” is an infrastructure initiative in the Water Supply and Storage sector, located in Brookings, South Dakota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Such bids are to provide for the following approximate "WORK QUANTITIES": 385 SY Remove Asphalt Concrete Pavement, 20 SY Remove Concrete Pavement, 521.0 Ton Base Course, 136.5 Ton Asphalt Concrete Composite, 20 SY 9 Miscellaneous PCC Pavement, 120 LF 30 RCP Arch Storm Sewer Pipe, 6 EA 30 RCP Arch Sloped End, pipe culvert undercut, controlled density fill, unclassified excavation, epoxy pavement marking paint, erosion control, permanent seeding, traffic control, and miscellaneous items.

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Dakota

City

Brookings

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Cement, Commercial, Road, Waste Processing and Treatment

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project