Concrete Pad and Grading at Tehachapi Recycling
Sector: Water Supply and Storage • Location: Bakersfield, California, United States of America
Source: Dodge
The work to be performed consists, in general, of the construction of a 200-ft by 200-ft concrete pad, earthwork, and grading work, which includes site clearing and grubbing, excavation, grading, and engineered fill placement. The project also includes the construction of aggregate base access roads, a retention basin, V--ditch drainage channels, and associated surface water management systems, in
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Cement, Government, Waste Processing and Treatment
- Location
- Bakersfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Concrete Pad and Grading at Tehachapi Recycling
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed consists, in general, of the construction of a 200-ft by 200-ft concrete pad, earthwork, and grading work, which includes site clearing and grubbing, excavation, grading, and engineered fill placement. The project also includes the construction of aggregate base access roads, a retention basin, V--ditch drainage channels, and associated surface water management systems, including a riprap-lined trapezoidal spillway channel. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bakersfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Cement, Government, Waste Processing and Treatment |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
