Concrete Sidewalk Replacement - Area 2
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
The Contractor shall furnish all labor, supervision, materials, equipment, supplies, tools, safety measures, and maintenance of traffic required for replacement of broken, cracked or lifted sidewalk sections at various locations in the City of Weston. The work includes, but is not limited to, sawcut, removal and disposal of existing sidewalk, installation of new sidewalk sections. The work is loca
- Status
- Closed
- Sector
- Car parking, Cement, Automotive, Government, Commercial
- Location
- Weston, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Concrete Sidewalk Replacement - Area 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor, supervision, materials, equipment, supplies, tools, safety measures, and maintenance of traffic required for replacement of broken, cracked or lifted sidewalk sections at various locations in the City of Weston. The work includes, but is not limited to, sawcut, removal and disposal of existing sidewalk, installation of new sidewalk sections. The work is located Citywide in Weston, Florida. The Contractor is responsible to review and familiarize with the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Weston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Cement, Automotive, Government, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
