Condition Assessment - Priority Sites
Sector: Water Supply and Storage • Location: Milwaukee, Wisconsin, United States of America
Source: Dodge USA
Condition assessment of approximately 64,000 linear feet of monolithic Metropolitan Interceptor Sewer (MIS) and large-diameter pipe at the Jones Island Water Reclamation Facility to determine the impact of performance related to potential hydrogen sulfide exposure. The MIS diameter ranges from 42"-96" and ranges in shape from circular to special section. The project is split up into five areas thr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Condition assessment of approximately 64,000 linear feet of monolithic Metropolitan Interceptor Sewer (MIS) and large-diameter pipe at the Jones Island Water Reclamation Facility to determine the impact of performance related to potential hydrogen sulfide exposure. The MIS diameter ranges from 42"-96" and ranges in shape from circular to special section. The project is split up into five areas throughout the service area. There are 85 manhole structures throughout the alignment of the MIS tha... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
